The Effect of Work System Optimization on the Efficiency and Productivity Assembly Workstation Product Using an Integrated TMS
DOI:
https://doi.org/10.35194/jmtsi.v10i1.6026Keywords:
Time and Motion Study, Value Stream Mapping, Therblig, Ergonomics, Automotive IndustryAbstract
Productivity is an important aspect in the manufacturing industry, including in the assembly process of the Cover Seat Belt Anchor product at PT Solo Plastik Indonesia. Problems found include the absence of standard work methods, high variations in operator movements, and irregular process times that result in motion waste and fluctuating production achievements. This study aims to analyze the existing work system and develop proposals for improvement methods to increase efficiency and productivity. The methods used include Time and Motion Study (TMS), Value Stream Mapping (VSM), right-left hand maps, therblig analysis, motion economy principles, and stopwatch study. Data was obtained through direct observation, measurement of operator work time, and identification of motion elements. The results show that 5 ineffective motion elements can be eliminated or combined. The proposed work method can reduce standard time from 60 seconds to 48.83 seconds per unit (efficiency ±9.3%), balance the use of the right and left hands, and reduce motion waste. The implementation of standardized work methods has the potential to increase operator productivity and work quality, in line with the current trend in the automotive industry that integrates lean manufacturing and ergonomics.
References
[1] M. Sinungan, Produktivitas Apa Dan Bagaimana. Jakarta: Bumi Aksara, 2009.
[2] P. M. Pardede, Manajemen Operasi Dan Produksi. Yogyakarta: Andi, 2005.
[3] Eni Mahawati, Analisis Beban Kerja Dan Produktivitas Kerja. Yayasan Kita Menulils, 2021.
[4] I. Z. R. A. Dan J. H. T. Sutalaksana, Teknik Perancangan Sistem Kerja. Itb, 2006.
[5] I. Khadijah, A. Kusumawardhani, And J. Manajemen, “Analisis Pengukuran Kerja Untuk Mengoptimalkan Produktivitas Menggunakan Metode Time and Motion Study,” Diponegoro Journal of Management, Vol. 5, No. 3, Pp. 1–15, 2016, [Online]. Available: Http://Ejournal-S1.Undip.Ac.Id/Index.Php/Dbr
[6] Y. Demmanggasa, “Studi Pengukuran Waktu Kerja Terhadap Peningkatan Kinerja Karyawan,” Jnsta Adpertisi Journal, Vol. 3, No. 2, Pp. 21–28, 2023, Doi: 10.62728/Jnsta.V3i2.459.
[7] C. H. Sumerli and N. Mayselah, “Optimalisasi Produktivitas Dengan Metode Time and Motion Study Di Pt. Xyz,” Journal of Research on Industrial and System Engineering, Vol. 1, No. 1, Pp. 1–12, 2023.
[8] M. S. J. Rother, Value Stream Mapping to Add Value and Eliminate Muda, Illustrated, Reprint. Lean Enterprise Institute, 2003.
[9] S. L. Maknun and J. Aidil, “Implementation of Lean Manufacturing Approach Using Value Stream Mapping to Optimize Cycle Time and Reduce Process Waste (Case Study: Cv. Teguh Jaya Mandiri),” Ijiem - Indonesian Journal of Industrial Engineering and Management, Vol. 5, No. 2, P. 589, Nov. 2024, Doi: 10.22441/Ijiem.V5i2.22440.
[10] I. Fardiansyah, T. Widodo, And W. Anggraini, “Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi Kasus: Pt Xyz),” Journal Industrial Manufacturing, Vol. 7, No. 2, P. 85, Sep. 2022, Doi: 10.31000/Jim.V7i2.6924.
[11] D. Ayu, M. Andris, And H. F. Satoto, “Analisis Waktu Standar Dalam Penentuan Jumlah Tenaga Kerja Pada Produksi Cage Wheel Dengan Metode Stopwatch Time Study (Studi Kasus: Cv. Lancar Jaya),” Jurnal Ilmiah Teknik Dan Manajemen Industri, Vol. 3, No. 1, Pp. 371–380, 2023, Doi: 10.46306/Tgc.V3i1.
[12] Muhammad Basri And Rosfiah Arsal, “Pengaruh Efektivitas Dan Efisiensi Kerja Pegawai Terhadap Kinerja Organisasi Dinas Sosial Kota Kendari,” Journal Publicuho, Vol. 5, No. 4, Pp. 1127–1138, 2022, Doi: 10.35817/Publicuho.V5i4.52.
[13] F. R. Khusnu Syahputra, A. Suryadi, And E. Purnamawati, “Perancangan Meja Belajar Multifungsi Ergonomis Dengan Metode Pahl and Beitz Guna Mendukung Aktivitas Belajar Di Rumah,” Juminten, Vol. 2, No. 4, Pp. 121–132, Jul. 2021, Doi: 10.33005/Juminten.V2i4.238.
[14] S. Kamuli, “Pengaruh Iklim Organisasi Terhadap Produktivitas Kerja Pegawai Di Sekretariat Daerah Kota Gorontalo.”
[15] A. A. Pangestu, A. Alamsyah, And P. Negara, “Implementasi Metode 5s (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) Pada Unit Reaching di Pt. Xyz Tekstil Majalengka.”
[16] Zhang, “Integrating Lean and Ergonomic Principles in Automotive Assembly Lines. International,” Journal of Production Research, Pp. 4215–4230, 2023.
[17] L. C. Kumar, “Productivity Enhancement Through Combined TMS and Lean Tools in Automotive Industry,” J Manuf Syst, Pp. 201–212, 2022.
[18] H. P. E. S. Nur Fadilah Fatma, “Penerapan Leang Manufacturing Dengan Metode Value Stream Mapping Untuk Mengurangi Waste Pada Proses Pengecekan Material Bahan Baku Ke Lini Produksi,” Journal Industrial Manufacturing, Vol. 7, No. 1, Pp. 41–54, Feb. 2022.
[19] Sugiyono, Metode Penelitian Kuantitatif, Kualitatif Dan R&D. Bandung: Alfabeta, Cv, 2022.
[20] Sritomo Wignjosoebroto, Ergonomi Studi Gerak Dan Waktu. 2006.
[21] I. Khadijah and A. Kusumawardhani, “Produktivitas Menggunakan Metode Time and Motion Study,” Vol. 5, Pp. 1–15, 2016.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Media Teknik dan Sistem Industri

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.




