Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Home
About
About the Journal
Submissions
Editorial Team
Reviewers
Current
Archives
Announcements
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 10 No. 2 (2026)
Vol. 10 No. 2 (2026)
DOI:
https://doi.org/10.35194/jmtsi.v10i2
Published:
2026-09-30
Articles
Integration of Critical Path Method (CPM) and Material Requirement Planning (MRP) for Optimizing Production Scheduling and Material Procurement in Hull Block Fabrication
Muhammad Destri Sahputra Hardi, Hery Irawan
PDF
DOI:
https://doi.org/10.35194/jmtsi.v10i2.6353
Production Line Efficiency Improvement Using the Line Balancing Method on the 3W Frame Welding Line at PT X
Mohamad Zulfahmi , Yuliani Fauziah, Filemondra Damanik
PDF
DOI:
https://doi.org/10.35194/jmtsi.v10i2.6581
Analysis of Production Line Balance in the Final Assembly Area Using Line Balancing and Promodel Simulation in an Automotive Company
Ir. Indra Setiawan, ST. MT., Tri Ngudi Wiyatno, Abdilah Putraman Septianto
PDF
DOI:
https://doi.org/10.35194/jmtsi.v10i2.6414
Addmenu
Additional Menu
Focus and Scope
Section Policies
Publication Frequency
Peer Review Process
Open Access Policy
Publication Ethics
Copyright & License
Plagiarism Policy
Article Retraction & Withdrawal
Articles Processing Charge
Author Guidelines
Indexing & Abstraction
Journal History
Download
Download
tools
Recommendation Tools
Keywords
Visitor
Visitor Statistics
Indonesia
485
Malaysia
3
United States
2
Germany
2
China
2
Vietnam
1
Japan
1
Italy
1
United Kingdom
1
France
1
Brazil
1
View My Stats