Performance Analysis of Maintenance Using the RAM Method (Reliability, Availability, Maintainability) on the Reciprocating Compressor Unit C-4xxx at PT PSX
DOI:
https://doi.org/10.35194/jmtsi.v10i1.5752Keywords:
Reciprocating Compressor, Reliability, Availability, Maintenability, Pareto, FishboneAbstract
This study evaluates the maintenance performance of the Reciprocating Compressor C-4XXX unit, which plays a crucial role in the gas production process but frequently experiences disruptions such as unplanned shutdowns, high suction temperatures, and excessive exhaust pressure. The RAM (Reliability, Availability, Maintainability) method is used with historical data from January to November 2024. The research aims to analyze the maintenance performance of the Reciprocating Compressor C-4XXX, as well as to compile proposals for improving maintenance efficiency based on quantitative data and technical analysis using the RAM method, which is expected to provide insight for the management of company as a source of information on the application of the RAM method as a basis for efforts to optimize operations and improve machine performance. The methods used are quantitative analysis of the RAM method, Pareto diagram analysis, fishbone diagram, and 5W+1H improvement proposals. The results show an average Reliability (MTBF) value of 139.50 hours, MTTR of 1.66 hours, and Availability reaching 99.24%. Pareto analysis found the main cause of high temperature pressure disturbances, and Fishbone identified factors causing problems that occurred related to worker consistency, operating conditions, lubrication systems, cooling, and controls. Improvement proposals were prepared using the 5W + 1H analysis, covering aspects of labor, methods, machines, materials, and the environment taken from the fishbone analysis carried out. By using the RAM method for companies can contribute to improving technician competency, select quality components, and improving work procedures supported using information technology.
References
[1] F. Burhanuddin, A. H. Yuwono and D. Yuliati., “"Improved Maintenance Strategy for Reciprocating Compressor Based on Reliability and Safety.",” International Journal of Reliability, Risk and Safety: Theory and Application, 2024.
[2] S. Andalucia, “Operation and Troubleshooting of Gas Compressors at The Lembak Gas Compressor Station (SKG), PT Pertamina Hulu Rokan Region 1 Zone 4,” Jurnal Cakrawala Ilmiah, vol. 2.5, pp. 2133-2152, 2023.
[3] Anthony dan M. Bob, " Occupational Safety and Health (K3) Risk Analysis in Reciprocating Compressor Operation Using the SWIFT (Structured What If Technique) Method at PT. ABC," Industri Inovatif: Jurnal Teknik Industri, vol. 11, no. 1, 2021.
[4] F. Corvaro, G. Giacchetta, B. Marchetti, and M. Recanati, “Reliability, Availability, Maintainability (RAM) study, on reciprocating compressors API 618,” Petroleum, vol. 3, no. 2, pp. 266-272, 2017, doi: 10.1016/j.petlm.2016.09.002.
[5] A. A. Wati, “Analysis of Reliability, Availability, and Maintainability of Reciprocating Compressors in a Lubricant Refining Company,” Diploma thesis, Politeknik Perkapalan Negeri Surabaya, 2020.
[6] Dee publish Store, “Descriptive Research Is: Definition, Types and Methods,” Dee publishes Store, 2023. [Online]. Available at: https://deepublishstore.com/blog/materi/penelitian-deskriptif/. [Accessed: 20-Jun-2025].
[7] Ubmadmin, “Learning Secondary Data, From Definition to Data Collection Techniques,” Universitas Bunda Mulia (UBM), Jun. 4, 2021. [Online]. Available: https://www.ubm.ac.id/belajar-data-sekunder-dari-pengertian-sampai-teknik-pengumpulan-data/. [Accessed: Aug. 27, 2025].
[8] A. Khoir and R. Abdul, “Analysis of Preventive Maintenance on Forklifts and Reach Trucks Using the Mean Time Between Failure (MTBF) and Mean Time to Repair (MTTR) Calculation Method at PT. DSV Solutions Indonesia,” Thesis, Faculty of Engineering, Islamic University of North Sumatra, Medan, 2024.
[9] R. Agustian, “Preventive Maintenance Analysis on Kernel Heater Machine Using Mean Time Between Failure (MTBF) and Mean Time to Repair (MTTR) Calculation Method at PT. Supra Matra Abadi,” Thesis, Faculty of Engineering, Islamic University of North Sumatra, Medan, 2023.
[10] R. Nawe, M. K. L. Rony, and W. T. B. Bhirawa, “Performance Maintenance Analysis on Main Oil Drilling Equipment at PT Geo Link Nusantara,” J. Tech. Ind. Unsurya, vol. 7, no. 2, 2018.
[11] Dolab, “Visualizing Pareto Charts with Excel,” DQLab, October 18, 2023. [Online]. Available: https://dqlab.id/tutorial-visualisasi-pareto-chart-dengan-excel. [Accessed: June 11, 2025].
[12] A. R. Mukhopadhyay, “Pareto chart for downtime and occurrences,” ResearchGate, 2012. [Online]. Available: https://www.researchgate.net/figure/Pareto-chart-for-downtime-and-occurrences_fig1_254348491. [Accessed: 11-Jun-2025].
[13] R. P. Wardhani, S. Sarungu, and S. Norhidayah, “Quality Control Techniques Using the Pareto Diagram Method to Achieve Customer Satisfaction,” Jurnal Teknosains Kodepena, vol. 4, no. 2, 2024
[14] M. Anestari, A. Azwardi, and F. Wijayanti, “Calculation of Performance Maintenance Value of Caterpillar 320D Excavator Using Reliability, Maintainability Method,” in Pros.Sem.Nas.Tech.Mesin, 2022,
[15] A. Fandi, “Six sigma DMAIC as a method of controlling the quality of chair products in SMEs,” JISI: J. Integrasi Sist. Ind., vol. 6, no. 1, pp. 11–17, 2019.
[16] Aldrian and A. Tsani, “Application of SIX SIGMA Method and Failure Mode and Effect Analysis (FMEA) with Improvement Using 5W+1H Method to Increase Rack Production (Case Study: PT. X-Steel Mitra Kontruksindo),” Thesis, Islamic University of Indonesia, Yogyakarta, 2023.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Media Teknik dan Sistem Industri

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.




